Fast, affordable Internet access for all.
anchor institutions
Content tagged with "anchor institutions"
County and State Partner For Local Connectivity in Iowa
In 2010, the Iowa Communications Network received a $16.2 million Broadband Technology Opportunities Program (BTOP). The project will connect all 99 counties in the state by upgrading an existing 3,000 mile network (PDF of the project summary). The state plans to bring 10 Gbps capacity points of presence to each county and to provide 1 Gbps service to about 1,000 anchor institutions. The project will be managed by the state's Department of Transportation, which will be using fiber primarily for traffic management.
A recent Ames Tribune article reports that the local community will be partnering with the state to capitalize on the existence of the fiber for connectivity. Story County, located in the very center of the state, will soon be using several strands in the Ames area to create a loop between city and county offices. The 20-year arrangement will cost the county $15,000 and provides ample capacity to support the county's work and support future uses. From the article:
“For us this is a huge windfall,” [Story County Information Technology Director Barbara Steinback] said. “If we were to go on to a project like this on our own, it would cost between $250,000 and $300,000.”
The opportunity comes at a good time for Story County. The sheriff’s office recently began using new mobile laptops that Steinback said have been putting a strain on the network and, along with some other projects, has been resulting in some slowness issues.
“So we do need to take advantage of this opportunity,” she said.
Extensive Fiber Route Snaking Its Way Across Michigan
The nonprofit Merit Network, Inc., of Michigan, started in 1966 as a way to provide networking help to the state's research and educational facilities across the state. Over the years, the organization has kept up with the times and is now spearheading the Rural, Education, Anchor, Community and Healthcare - Michigan Middle Mile Collaborative (REACH-3MC II) project.
The project will bring connectivity to community anchor institutions and underserved rural communities in the Upper and Lower Peninsulas. The exentive fiber project is funded with two Broadband Technologies Opportunities Program (BTOP) grants totaling $103.2 million. When completed, Upper and Lower Michigan will house an additional 2,287 miles of fiber.
Matt Roush recently reported on the project, which is well underway in Monroe County in the southern part of the state. Roush brought news about installation of telecommunications huts, an early step in expanding the network into northern Michigican. From the article:
REACH-3MC will connect 105 community anchor institutions as the network is built and will pass 900 more over time. Led by Merit Network, REACH-3MC includes sub-recipients from the private sector to make broadband readily available to households and businesses that lack adequate service options in the 52 counties that make up the project service area.
For more details on the project, including a map of the proposed routes, follow this link to a PDF of the project overview.
Wireless is Driving a Fiber Optic Boom
During 2011, nineteen million miles of fiber optic cable were installed in the United States, according to CRU Group, a global research firm. That means all the fiber that was laid in the U.S. last year could be wrapped around the equator 763 times. It was the largest installation since the boom year of 2000. And the reason has a lot to do with wireless services.
When using 4G on that new mobile phone, your connection is mostly wired. It is wireless from the tower to your hand -- a distance of anywhere from a few thousand feet to a few miles. But probably for hundreds of miles, that connection is on fiber-optic lines.
Before a tower can offer 4G services, it needs a fiber cable, and that is driving a boom in connecting towers. In our recent case studies on Chattanooga, Lafayette, and Bristol, we noted that both Bristol and Chattanooga have connected towers with fiber optics for 4G wireless service from major carriers.
The boom in 2000 was famously short sighted, in part because it was almost all located in major corridors with other fiber cables -- no one was making the last mile connections to residents and local businesses.
Regardless of how much fiber optic lays out there unused, we need more -- but in the right places. A Wall Street Journal article by Anton Troianovski recently discussed the boom in new fiber investment, quoting Hunter Newby, Chief Executive of Allied Fiber:
"The notion there is a fiber glut is not true," Mr. Newby says, arguing that much of the fiber-optic cable that is available is simply not in the right place - not at suburban office parks and cellphone towers that need it.
Allied Fiber is building its own network between New York and Chicago with the intention of offering alternatives to established carriers, including Verizon and AT&T. Newby and Allied believe that other Internet companies, wireless carriers, hospitals, and possible anchor institutions will want the choices they don't have now. By extending their network to the right places, Allied sees opportunity.
New Videos From DC-Net and DC-CAN Highlights Benenfits All Over the City
We have brought you news about DC-Net before and have even highlighted the community network in our report, Breaking the Broadband Monopoly. Now we want to draw your attention to some videos they have produced.
Free WiFi hotspots all over town, secure indoor WiFi for government staff, and hundreds of miles of fiber throughout town are just a few of the advances DC-Net has made toward ubiquitous and reliable connectivity. DC-Net is a tremendous example of a publicly owned network providing the highest levels of performance for its subscribers.
DC-Net has released a video highlighting their advancements in DC and how their work has positively impacted the community.
The second video is from Don Johnson, Director of DC-Net, presenting some info on DC Community Access Network (DC-CAN) to a Ward 5 audience. DC-CAN is an initiative to bring broadband to the underserved areas in DC with middle-mile connections. From the DC-CAN website:
The DC Community Access Network (DC-CAN) will bring affordable, value-added broadband services to over 250 health, educational, public safety, and other community anchor institutions primarily in broadband underserved areas of the District. It also creates a high speed middle mile network for last mile service providers to deliver affordable broadband access to residents and businesses in underserved areas.
DC-CAN already has 67 miles of fiber laid as a backbone and four city MegaPOP sites are now connected to the 100G backbone. From Ciena, one of DC-Net's private sector partners:
With this new infrastructure in place, DC-Net has already connected 49 new Community Anchor Institutions to the network and upgraded 52 existing anchor sites. Community anchors include charter schools, health clinics and other health care providers, community-based training programs, after school and early childhood development programs, libraries, and public safety sites.
Collaboration Alive and Well In Wisconsin Broadband Expansion
Wise people say that collaboration often leads to a better result than individual efforts. Recently, I was reminded of the benefits of different levels of collaboration, as they relate to community networks, in two separate articles about fiber-optic expansion in Wisconsin.
First, is a recent Randy Happel article in Trenchless Technology, about how UW-Extension is working with a private telecommunications network design, engineering, and construction firm to expand the fiber-optic landscape in their state. Over thirty-seven million dollars in stimulus funding for UW-Extension through the American Recovery and Reinvestment Act (ARRA) is allocted as part of the Broadband Technology Opportunities Program (BTOP). The result will be a 630-mile fiber-optic network to help improve connectivity in Wisconsin.
CCI Systems, the private partner, has been around since 1955 and has a history in CATV networks. From the Happel article:
“Public-private partnerships are our expertise,” says Dave Mattia, director of operations for CCI Systems. “We are also quite adept at working within the parameters for the federal funding programs. Our experience and expertise in designing and building broadband, fiber-optic communications networks are great assets to our partners.”
“Our approach is extremely disciplined and methodical,” says Cory Heigl, director of business development for CCI Systems. “Collaboration, listening and cooperation are critical to maximize project efficiencies. Other firms may start by choosing a technology. We begin by listening and identifying the desired end result. Our approach streamlines the process and has proven most effective in securing funding, especially grants and stimulus money.”
After fiber installation is complete, scheduled for June 2013, CCI Systems will shift from installation and design to maintenance and support. After the long battle with AT&T, working with a cooperative partner like CCI Systems must be a welcome relief for UW-Extension.
Clallam County, Washington, Connects Anchor Institutions
Washington's Olympic Peninsula is one step closer to being laced in a new fiber-optic network. The first link in the new Peninsula-wide broadband project is between Blyn and Sequim and will serve the Jamestown S'Klallam tribe from its new Blyn library to a local medical clinic located in Jamestown. Also benefiting from the new expansion will be the Sequim Library. Thirty people, including state and federal elected officials, a representative from the Jamestown S'Klallam tribe, NoaNet, and local public safety professionals, recently gathered together at the Sequim Library to celebrate the new expansion, as reported by Jeff Chew in the Peninsula Daily News.
Clallum County PUD's network is part of NoaNet, an open access wholesale only network, and now has 24 miles of fiber-optic cables between Port Angeles and Sequim. From Chew's artcle:
“High-speed broadband is the most exciting thing that has happened in law enforcement in my career,” Port Angeles Police Chief Terry Gallagher told about 30 at the Sequim Library.
Gallagher said broadband Internet will allow officers to work faster and more efficiently, enabling them to multitask in their patrol cars, such as checking a motorist's identification while checking on a city webcam and communicating all at once.
The construction of the project is overseen by NoaNet. The network is planned to run from Brinnon to Port Ludlow and Port Townsend and then across the Olympic Peninsula to Neah Bay to Forks. This portion of the project, from Blyn to Sequim, was chosen first because it was part of the first round of funding and because it is less complex than other legs of the network.
Publicly Owned Network in Wisconsin Creates Taxpayer Savings
Layton and Centerville Start Seeing UTOPIA Benefits
“We’d love to have it,” said Cris Hogan, executive vice president of Hogan & Associates Construction in Centerville. “It’s much faster, with more capabilities, and we’re hoping less expense.” As a commercial builder, Hogan’s company frequently transfers detailed documents and plans to subcontractors electronically. Under current bandwidth conditions, that process can be time consuming, he said. Hogan’s wait for screaming-fast Internet could soon be over. “No one in Centerville has Utopia right now but they’re getting close with the stimulus,” said Blaine Lutz, the city’s finance director. His workplace, Centerville City Hall, should be hooked up by October.The current expansion will connect 141 anchor institutions in the two communities as well as many more in Payson, Orem, Murray, Midvale, West Valley City, and Perry. As of now, residents generally have to pay a steep upfront $3,000 connection fee for the physical connection, but local governments are investigating different options to allow residents to connect to the network affordably, as Brigham City did with a special assessment area. As for the capacity of the network and value offering, it crushes Comcast.
New Broadband Networks Increase Tension in Vermont
SoverNet will own the infrastructure but is required to provide bandwidth at wholesale cost to providers who extend the service outward. Loredo Sola is skeptical. He says he's already lost one institutional contract to the SoverNet project. He says that's forced E.C. Fiber to scrap its plans to serve smaller users in the area.Sovernet is building a middle mile network connection community anchor institutions, but is an example of the exact wrong way to do it. Supposedly, the investment (the vast majority of which is funded by a federal stimulus award) will allow more ISPs to build more last mile networks as they have access to better backhaul. But lowering the operating cost of a network does very little to make that network affordable to build. The high up front capital costs are what limit broadband in rural (and urban too!) areas.
UTOPIA Expanding into Centerville with Broadband Stimulus Award
UTOPIA trucks have started working in Centerville this week, putting in hub and connector points that will help bring the long-planned fiber optic network to public institutions in the city. Though this will also lay the groundwork for bringing the network to residents, the current phase of construction is covered by grant money that only involves government institutions. Construction on residential connections won’t begin until sometime this summer.Centerville has been stuck with considerably less reliable wireless connections that do not offer anywhere near the capacity of fiber-optic cables. The network will go beyond the typical anchor institutions (e.g. City Hall, muni buildings, and often schools) to connect traffic lights as well -- an increasingly common approach. After this phase, UTOPIA will begin expanding residential connections -- but they will prioritize areas that show the most interest in taking services.
Before the summer construction begins, residents should expect to see an information and advertising push explaining the different companies offering services on the UTOPIA network and seeking those wishing to sign up for the services (though UTOPIA and the UIA maintain the network, they offer no services. Outside companies, such as XMission, use the network for their services). Placing the advertising before the construction will determine whether or not there’s enough demand to justify the expense of laying in the network in a given area.UTOPIA continues to impress even past critics with its new management and approach.